Not known Facts About Micro pile contractors
Elevate the bottom horizontal structural member of the ground assembly to get at the very least 12 inches earlier mentioned The bottom Flood Elevation.a hundred twenty five-inch of steel towards the thickness on the piles. This could add costs for the job if it hasn't by now been accounted for through driveability analyses or lateral capacity needs